Utah Traffic & Road Conditions

4 major and 1 minor incidents across Utah right now.

Updated 8:16 PM · Source: UDOT Traffic

  • MajorRoad Weather · Updated Nov 2nd at 8:56 am
    WB SR-163 at US-191 Jct (South of Bluff)
    Closed
    US-163 EB: Closed · US-163 WB: Closed
    Reported 4:41 AM, Nov 2
  • MajorRoad Weather · Updated Nov 3rd at 11:33 pm
    EB SR 163 at SR-261 Jct (MP 25)
    Closed
    Reported 4:58 AM, Nov 2
  • MajorRoad Weather · Updated Nov 3rd at 2:10 pm
    Both Directions SR-262 at MP 20 (N of Montezuma Creek)
    Closed
    SR-262 NB: Closed · SR-262 SB: No Lanes Blocked.
    Reported 9:56 AM, Nov 2
  • MajorCrash · Updated Nov 14th at 4:18 am
    EB I-80 at MP 84.3
    No Lanes Blocked
    Reported 4:18 AM
  • MinorRoad Restrictions · Updated Nov 14th at 5:43 am
    Traction Devices Required [For All Vehicles] EB SR-143 MP 14 - 17 (Parowan to Brian Head)
    No Lanes Blocked
    Reported 1:00 PM, Nov 13
  • Mar 17th 2025 at 12:00 am to Jul 31st 2027 at 12:00 am
    I-15 at 1800 North, Sunset

    Impacts -> Alert: Beginning Friday night, October 16, at 8 p.m. through Monday morning, October 19, at 4 a.m. the southbound I-15 off-ramp at 650 North will be closed. Motorists are advised to use the detour to the 700 South off-ramp. Drivers should use caution and be prepared for changing traffic patterns. SB I-15 shifted traffic patterns between 5600 South and 650 North and drivers should use caution through the area. Narrow lane width of 11'. Extra wide shoulder in some places. New interchange at 1800 North, Widening 1800 North from Main Street to 2000 West. Hotline: 385-383-6576 Email: 1800north@utah.gov

  • Mar 27th 2025 at 12:00 am to Apr 7th 2028 at 12:00 am
    I-84 bridges crossing the UP railroad; Located just west of the eastbound I-84 rest area. Both bridges span from mileposts 90.6 - 91.2.

    (updated 11/3/26) Two travel lanes have been restored in each direction over the bridge region. Construction will suspend starting Nov. 26 Westbound single lane closure | late Winter/early Spring 2027(TBA) - Winter 2027 | Day & Night  Construction resumes. All traffic will return to the crossover configuration on the new EB bridge, with one lane WB and two lanes EB. Wide loads: WB loads will be restricted above 11 ft Light to moderate delays expected during single lane closures(5-15 min), but be prepared to slow to 55 mph and merge into the open lane. Motorists are encouraged to zipper-merge well in advance of lane closures and take alternating turns merging into the open lane. This will keep traffic congestion minimized. BACKGROUND: The I-84 Weber River Bridge Replacement project is fully replacing two bridges originally constructed in the 1960s that cross the Weber River. Once replaced, these bridges will continue to play a vital role in assisting Weber Canyon travelers. Work in 2026 includes construction of new EB Bridge and the demolition of the old bridges. Once complete, the Westbound bridge will be constructed through early Winter 2027. Final close-out work is anticipated through early Spring 2028.

  • Apr 15th 2025 at 12:00 am to Jul 30th 2027 at 12:00 am
    US-89 from the US-89/SR-126 intersection to just south of Hargis Hill Road in Willard

    Upcoming Travel Lane Shifts Lanes on US-89 between approximately 200 North and 8700 South in Willard will be shifting and changing configuration in the coming week. These shifts will allow crews to install rumble strips, permanent striping, adjust road shoulders, and complete final grading. Schedule Thursday, Oct. 8 – Sunday, Oct. 11 Traffic will be shifted to the west side of US-89. Monday, Oct. 12-Tuesday, Oct. 13 Traffic will shift to the outside lanes allowing work to occur in the median. Wednesday, Oct. 14 Traffic will shift to the middle lanes allowing work to occur on the outside lanes and shoulders. Traffic will remain in the middle lanes for up to one month. What to Expect Narrowed and shifted lanes throughout the project area. Reduced speeds and possible delays. Drivers turning onto US-89 from side streets should come to a full and complete stop at the stop bars before turning. Traffic patterns have changed, and vehicles that roll through the stop bars or turn without stopping may enter live traffic in the opposing direction. Please drive with caution through the work zone, follow posted signs and reduced speed limits, and allow extra travel time. Schedule is subject to change with weather and field conditions.

  • Aug 25th 2025 at 12:00 am to Jul 31st 2028 at 12:00 am
    SR-224 Between Ute Blvd and Park Ave

    High Valley Transit SR-224 (The Bobsled Express) is a bus rapid transit construction project that spans seven-miles from Kimball Junction to Park City Old Town. The project will include segments of dedicated bus lanes as well as new stations along the corridor. Construction got underway in 2026 and is scheduled to be complete summer 2028. 2026 work includes utility upgrades, median removal and replacements, roadway widening and station construction. During construction, travelers can expect periodic lane shifts, shoulder closures, and changing traffic patterns. The project will maintain two-lanes of travel in each direction whenever possible. Work will be paused over the winter months.

  • Oct 1st 2025 at 12:00 am to Aug 30th 2027 at 12:00 am
    US-189 in Provo, from 920 South to 400 South

    Phase One Traffic Pattern: University Avenue Bridge, from 920 South to 400 South is down to one lane is each direction. Traffic has been shifted to the east side of bridge, with one lane in each direction. Anticipate delays, drivers are encouraged to use an alternate route. Up to 10 min. delays expected during peak travel times. It is expected that traffic will remain in the Phase One configuration until late fall, 2026.

  • Jan 5th 2026 at 12:00 am to Jan 4th 2027 at 12:00 am
    US-6 in Spanish Fork Canyon from Chicken Hollow to Tie Fork rest area (milepost 189.5 to 201.4)

    By early Sunday, Sept 13, all EB traffic will be moved back to its original configuration in order to accommodate paving. EB traffic will have two lanes starting just west of Sheep Creek Rd up to MP 196, just before the cemetery. Once paving is complete, EB traffic will move back to the one lane temporary configuration for the remainder of construction. Our crews will be removing and replacing the asphalt overnight in the excavated areas along US-6 from Sunday, Sept 13, through Fri, Sept 18. Work will begin at 6:30 p.m. and conclude at 6:30 a.m. each night. _________ As excavation continues, our crews will begin rock hammering overnight. Drivers may hear sudden loud noises as they pass through US-6 between 7 p.m. and 7 a.m. Motorists can expect delays of up to ten minutes as some lanes will be closed to accommodate work such as asphalt and concrete removal and replacement. There will be no lane closures when work is not in progress (7 p.m. to 7 a.m. most weekdays).

  • Feb 16th 2026 at 12:00 am to Dec 4th 2026 at 12:00 am
    I-15 | Start Milepost: 210 - End Milepost: 219

    !! Traffic Alert !! Plan on light to moderate daytime delays during peak periods SOUTHBOUND Speeds will be reduced to 70 mph through work zone Mon - Thu | (7am - 6pm) | Variable short distance single lane closures possible Starting August 25 | (All Hours/Days) | Motorists should be prepared for traffic shifts onto bypass roads while crews begin work on bridges. This configuration will continue through project completion. *** Lane Width Restriction (daytime only) 14 ft. during single lane closures NORTHBOUND Speeds reduced to 70mph through work zone. Mon - Sat | Day/Night | Short distance lane closures possible | Traffic shifts onto bypass roads TBA *** Lane Width Restriction (day/night) 14 ft. during single lane closures UDOT is rehabilitating 10 bridges in both the north and southbound direction west of Levan. Work will continue through October, 2026, and may resume in Spring 2027. ---- Contact the dedicated public involvement team for questions or wide load accommodations @ 801-838-8363 -----

  • Mar 25th 2026 at 12:00 am to Dec 31st 2027 at 12:00 am
    1600 N. from 1200 W. to State Street in Orem

    From 10/22 to 10/30, crews will complete utility work along 1600 North between 1200 West and 650 West from 10 p.m. to 6 p.m. each night. See website for more details. ------------------------------------------------------------------------- From 10/21 to 10/22, the left-turn lane from 1600 N onto northbound 800 W will be closed. See website for more details. ------------------------------------------------------------------------- From 10/22 to 10/25, 950 W and 650 W will be closed at 1600 N. Visit the website for more information and to view detour maps.

  • Apr 27th 2026 at 12:00 am to Nov 15th 2026 at 12:00 am
    US-6 & US-89 Junction

    TRAFFIC ALERT: Traffic on US-6 through Thistle Junction is reduced to one lane in each direction at all times through early November. Travel on both US-6 and US-89 will be maintained in all directions throughout construction, but with reduced capacity. Motorists should expect delays, especially during peak travel times. PROJECT OVERVIEW: UDOT is replacing the T-intersection at the US-6 and US-89 junction with a grade-separated interchange to improve safety. US-89 will be routed through a new underpass underneath US-6. New on- and off-ramps for US-6 and US-89 will be built to provide safer, more efficient merging for drivers.

  • May 18th 2026 at 12:00 am to Nov 30th 2026 at 12:00 am
    US-89 and SR-20 to Circleville Canyon

    The Utah Department of Transportation (UDOT) has begun improvements from the US-89 and SR-20 intersection to Circleville Canyon - approximately ten miles - as of May 18, 2026. These improvements will be finished in August 2026. There will be one lane in each direction from approximately 7 a.m. to 7 p.m., Monday through Friday. Motorists can expect up to 15-minute delays in each direction.

  • Jun 3rd 2026 at 12:00 am to Dec 31st 2026 at 12:00 am
    SR-9; MP 0.2 to 57.1 & Zion Mount-Carmel Highway

    ALERT: Expect multiple work zones through SR-9 with both shoulder work and one-way traffic Monday through Thursday (daytime and nighttime work) in Zion National Park and shoulder work in Hurricane, Rockville, and Mount Carmel. Crews are installing fiber optic cables to improve broadband access. --------------------- PROJECT BACKGROUND: The Utah Department of Transportation (UDOT), in partnership with the National Parks Service, is undertaking a significant project to install middle-mile fiber optics to support last-mile connectivity to communities along State Route 9 and the Zion-Mount Carmel Highway. This initiative is part of UDOT's broader effort to expand and modernize the state's fiber optic infrastructure, enhancing connectivity and supporting Intelligent Transportation Systems (ITS) throughout Utah. Work began on Wednesday, June 3. R4.21975

  • Jul 6th 2026 at 12:00 am to Nov 30th 2026 at 12:00 am
    On US-40 near Currant Creek, Fruitland, and Red Creek in Duchesne County

    The Utah Department of Transportation (UDOT) is repaving a 1-mile section of U.S. Highway 40 near the Wasatch and Duchesne County line as well as a 7-mile section between Fruitland and SR-208. Starting 9/21: Crews are conducting roadway reconstruction and paving at Red Creek (between MP 65-65.7). While reconstruction and paving is underway near Red Creek, US-40 is narrowed to one-way traffic with a 12-foot-wide lane during daytime and nighttime hours as well as on weekends, directed by flaggers or temporary signals. Expect delays. While paving occurs between 9/21 and 9/30, drivers should anticipate 2-3 hours closures of side streets while paving equipment passes by and the new asphalt cures. Work is anticipated to be completed by late November 2026.

  • Jul 5th 2026 at 12:00 am to Sep 30th 2027 at 12:00 am
    Bluff St from Main St to St George Blvd

    Construction of the improvements started on July 6, 2026. At the beginning of construction on the week of July 6 - 13 work will consist of placing work zone signage, traffic control, and installation of temporary striping. This will include a change in traffic patterns, and we encourage the public to be aware of these changes in order to maintain safety on the project. R4.18212

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB 500 S under I-215 | PIN 15689

    Intermittent closures for I-215 Reconstruct

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    EB 500 S under I-215 | PIN 15689

    Intermittent closures for I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB I-80 near I-215 | PIN 15689

    Intermittent closures for I-215 Reconstruct Project

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    EB I-80 near I-215 | PIN 15689

    Intermittent closures for I-215 Reconstruct Project contact: 855-215-8368 i215westimproved@utah.gov https://udotinput.utah.gov/i215westimproved

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB 1700 S under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    EB 1700 S under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    EB California Ave under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB California Ave under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB Indiana Ave under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 1st 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    EB Indiana Ave under I-215 | PIN 15689

    Intermittent traffic control as required to complete I-215 reconstruction.

  • Jul 28th 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    SB I-215 from North Temple to 1700 S | PIN 15689

    Lane and ramp closures for reconstruction and widening.

  • Jul 28th 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    NB I-215 from 1700 S to North Temple | PIN 15689

    Lane and ramp closures for reconstruction and widening. Project contact: 855-215-8368 i215westimproved@utah.gov https://udotinput.utah.gov/i215westimproved

  • Jul 14th 2025 at 12:00 am to Jul 14th 2027 at 11:59 pm
    WB North Temple PN 15689

    I-215 reconstruct

  • Jul 14th 2025 at 12:00 am to Jul 14th 2027 at 11:59 pm
    EB N. Temple PN 15689

    I-215 Reconstruct

  • Aug 17th 2026 at 12:00 am to Dec 31st 2026 at 12:00 am
    SR-89; MP 81 to 141.5

    ALERT: Expect multiple work zones through SR-89, and US-20 with shoulder work Monday through Thursday. Crews are installing fiber optic cables to improve broadband access. --------------------- PROJECT BACKGROUND: The Utah Department of Transportation (UDOT), in partnership with the National Parks Service, is undertaking a significant project to install middle-mile fiber optics to support last-mile connectivity to communities along State Route (SR) 9, SR-89, and US-20. This initiative is part of UDOT's broader effort to expand and modernize the state's fiber optic infrastructure, enhancing connectivity and supporting Intelligent Transportation Systems (ITS) throughout Utah. Work began on Wednesday, June 3. R4.21975

  • Aug 17th 2026 at 12:00 am to Dec 31st 2026 at 12:00 am
    US-20; MP 0 to 20.7

    ALERT: Expect multiple work zones through SR-89, and US-20 with shoulder work Monday through Thursday. Crews are installing fiber optic cables to improve broadband access. --------------------- PROJECT BACKGROUND: The Utah Department of Transportation (UDOT), in partnership with the National Parks Service, is undertaking a significant project to install middle-mile fiber optics to support last-mile connectivity to communities along State Route (SR) 9, SR-89, and US-20. This initiative is part of UDOT's broader effort to expand and modernize the state's fiber optic infrastructure, enhancing connectivity and supporting Intelligent Transportation Systems (ITS) throughout Utah. Work began on Wednesday, June 3. R4.21975

  • Aug 17th 2026 at 12:00 am to Dec 31st 2026 at 12:00 am
    US-6, between Woodside (MP 278) and the Substation north of the I-70 interchange (MP 290)

    UDOT is starting construction on approximately 12 miles of U.S. Route 6 in Emery County to place new pavement and complete bridge repairs between Woodside and the I-70 interchange.

  • Sep 1st 2026 at 12:00 am to Dec 4th 2026 at 12:00 am
    SR-7 Southern Parkway | Start MP: 15.8 - End MP: 17.5

    TRAFFIC ALERT: Work occurs during daytime hours (7am - 6pm) Mon - Fri. Crews are installing concrete barrier, guardrails, and signage. Motorists can expect traffic shifts with one lane in each direction maintained. Night work will occur Nov. 10 and Nov. 11 from 8pm-7am as crews refresh lane striping. Motorists can expect a single-lane closure with one-way alternating traffic control. During working hours, expect a 12-foot width restriction and a reduced speed limit of 55 MPH. Cyclists are encouraged to avoid the area. Motorists are encouraged to slow down and watch for traffic barrels directing them into the open lanes. BACKGROUND: UDOT will be implementing a new eastbound (EB) passing lane near the Sand Hollow Resort on State Route 7 (Southern Parkway) in Washington County. The project objectives are focused on improving traffic flow, reducing congestion, and enhancing safety along this busy corridor. **Contact the dedicated public involvement team with any questions: 801-838-8364

  • Aug 10th 2026 at 12:00 am to Nov 30th 2026 at 12:00 am
    Redwood Road

    Widen Redwood Road and extend the length of the Southbound turn lane at Pony Express Pkwy.

  • Sep 14th 2026 at 6:00 am to Dec 18th 2026 at 11:59 pm
    NB & SB US-89 in Hatch | PIN 18228

    Alternating one-way traffic controlled by a temporary traffic signal with delays of up to 15 minutes. This configuration will be in effect 24/7.

  • Sep 10th 2026 at 12:00 am to Dec 18th 2026 at 12:00 am
    US-89 in Hatch

    ALERT: Construction of US-89 passing lanes near Hatch is scheduled to begin as early as Monday, September 14 south of Hatch, Utah. Alternating one-way traffic controlled by a temporary signal will be in place 24/7 through mid-December. Expect delays of up to 15 minutes.

  • Sep 21st 2026 at 12:00 am to Jan 30th 2027 at 12:00 am
    State Highway 87 approximately 1/2 mile west of Altamont, Utah.

    SR-87 Slope Stabilization

  • Jul 25th 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    WB SR-201 Near I-215 | PIN 15689

    Lane and ramp closures for I-215 reconstruction. Project contact: 855-215-8368

  • Nov 2nd 2026 at 12:00 am to Apr 15th 2027 at 12:00 am
    SR-39 | Ogden Canyon | Start Milepost: 12.9 - End Milepost 13.3

    !!TRAFFIC ALERT!! November 2, 2026 - April 2027 | 24/7 Day and Night Beginning as early as Monday, November 2, and continuing through April 2027, one lane will be closed on SR-39 in the upper Ogden Canyon. Motorists can expect one-way alternating traffic 24/7, with flaggers during the day and a mobile traffic signal at night. Delays of 5-10 minutes are expected during peak travel times. Please allow extra travel time and slow down near the work zone. Ogden City contractors are replacing the water pipeline on SR-39. This effort is part of the Ogden Canyon 36 inch Water Transmission Pipeline Replacement Project. Contact the dedicated public involvement team @ 801-838-8365 with any questions. ---- Contact the dedicated public involvement team for questions or wide load accommodations @ 801-838-8363 -----

  • Aug 17th 2026 at 12:00 am to Dec 31st 2026 at 11:30 pm
    US-6 from Woodside to North of I-70 | PIN 20751

    Drivers on US-6 between MP 278 and MP 290 can expect daytime shoulder closures and overnight lane shifts with single-lane alternating traffic controlled by flaggers or a pilot car from Nov. 15 at 7 p.m. through Nov. 20 at 7 a.m.

  • Oct 13th 2025 at 12:00 am to Nov 1st 2027 at 11:59 pm
    US-189 from Wallsburg to Charleston | PIN 15731

    Lane and full closures for widening.

  • Dec 9th 2025 at 12:00 am to Dec 12th 2026 at 11:59 pm
    Main St from Park Ln to Shepard Ln | PIN 16933

    UDOT is reconstructing Main Street in Farmington from Park Lane to Shepard Lane. Email: 801-340-7661 Hotline: 801-340-7661

  • Mar 1st 2024 at 12:00 am to Nov 1st 2027 at 11:59 pm
    US-89; SR-126 to Perry PIN 15677

    We are reconstructing and improving storm drain systems on US-89 from the US-89/SR-126 intersection to just south of Hargis Hill Road in Willard. Hotline: (435) 280-8090 Email: us89willard@utah.gov

  • Jun 16th 2025 at 12:00 am to Nov 30th 2026 at 11:59 pm
    NB I-15 MP 43 to 56 | PIN 18224

    Traffic shifts for new lane construction.

  • Mar 17th 2025 at 12:00 am to Jul 31st 2027 at 11:59 pm
    1800 North Improved Mobility

    UDOT is widening 1800 North from Main Street to 2000 West and adding a new I-15 interchange. Alerts: Road Closures North side of 75 West is closed South side of 300 West is closed 475 West is closed South side of 1900 West is closed 1800 North will be closed from 650 West to 250 West on Monday, November 9 at 10:00 p.m. to Tuesday morning, November 10 at 5:00 p.m. Project Information: Hotline: 385-383-6576 Email: 1800north@utah.gov Website: udotinput.utah.gov/1800north

  • Aug 3rd 2026 at 12:00 am to Dec 31st 2027 at 11:59 pm
    I-80 at Jeremy Ranch | PIN 19918

    UDOT is replacing two bridges on I-80 at the Jeremy Ranch interchange in Summit County. What to Expect: Lane closures on Homestead Road Day work Monday through Friday from 7 a.m. to 5 p.m. with night work as needed Homestead Trail shifted to the road Trucks entering and exiting the work zone Increased noise, dust, and vibration in the project area Project Contact Information: 435-731-9296, i80jeremyranch@utah.gov, udotinput.utah.gov/i80jeremyranch

  • Jun 1st 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    SR-16 Bridge Work

    Alert: Motorists can expect delays as SR-16 will be reduced to one-way traffic that will be controlled by temporary signals. The project team has optimized the signal timing and motorists can expect delays of up to 10 minutes or 3 light cycles. One-way traffic will be in place through the winter. Truck widths: 11' foot lanes, wide loads restricted through 2026. Project Name SR-16 Bridge Work|udotinput.utah.gov/sr16bridges, 855-925-2801 project code 2400

  • Jul 29th 2026 at 12:00 am to Nov 30th 2026 at 12:00 am
    WB SR-201 at 8400 W Magna

    Crews will have a daily right lane closure on WB SR-201 at MP 8/800 W Magna as they build a new barrier wall in the area. Drivers should plan for single lane traffic Monday thru Friday from 7 a.m. to 3:30 p.m.

  • Oct 12th 2026 at 9:00 am to Nov 30th 2026 at 4:30 pm
    WB 2100 South; West Temple to Main St. | PIN 21940

    Intersection Signal/Lighting Work and Pedestrian Ramp Upgrades.

  • Aug 11th 2025 at 12:00 am to Dec 31st 2026 at 11:59 pm
    I-84 and 4400 South Bridge Replacement | PIN 19919

    The Utah Department of Transportation is replacing three bridges in Riverdale. The 4400 South bridge over I-15 was successfully rebuilt, and it reopened to the traveling public on June 16, 2026. Work continues on the two ramp bridges carrying traffic to and from I-15 to I-84 over 4400 South. This work began August 11, 2025 and is expected to conclude in fall 2026. Alerts: Westbound I-84 will be closed between I-15 and Riverdale Road beginning at 10 p.m. on Friday, November 6, through Monday, November 9 at 6 a.m. Traffic will be detoured to Riverdale Road to 31st Street to I-15. Additionally, 4400 is closed from Thursday, November 5, at 7 a.m. between the roundabouts and will re-open on Monday morning as well. No trucks with trailers, semi-trucks or other vehicles over 40 feet in length will be allowed on 4400 South between Cozy Dale Drive and Parker Drive during construction. A heigh limit of 13'6" is also in place. Project Hotline - 855-925-2801 (Project Code 3107) Email - i84bridges@utah.gov Project Website - udotinput.utah.gov/i84bridges

  • Mar 23rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    SB Legacy Pkwy from MP 11.3 to I-215 | PIN 22727

    Traffic shifts and daytime lane closures for median lane construction, with night and weekend work as needed. Project contact: 385-390-0103 | legacyparkwayimproved@utah.gov | https://udotinput.utah.gov/legacyparkwayimproved

  • Mar 23rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    NB Legacy Pwky from I-215 to MP 11.3 | PIN 22727

    Traffic shifts and daytime lane closures for median lane construction, with night and weekend work as needed. Project contact: 385-390-0103 | legacyparkwayimproved@utah.gov | https://udotinput.utah.gov/legacyparkwayimproved

  • Jun 1st 2025 at 12:00 am to Dec 31st 2026 at 11:59 pm
    Central Utah Fiber Sevier to Utah County | 21418

    Lane and shoulder closures for fiber infrastructure installation. Project Contact: 801-609-9878 centralutahtechnology@utah.gov https://udotinput.utah.gov/centralutahtechnology

  • Sep 15th 2026 at 7:00 am to Dec 1st 2026 at 7:00 pm
    State Street from N Temple to 300 N | PIN 22695

    Full closures for trail construction. Project Contact Information: 385-800-7003 pioneertrailimproved@utah.gov https://udotinput.utah.gov/pioneertrailimproved

  • Jul 28th 2025 at 12:00 am to Nov 27th 2026 at 12:00 am
    Geneva Road (SR-114), University Parkway to 1450 S

    On 10/31, one-way flagging on Geneva Road. See website for more details.

  • Nov 9th 2026 at 12:00 am to Apr 7th 2028 at 12:00 am
    East of Kanab

    Please be advised of the ongoing wildlife mitigation project will begin Monday, November 9. Construction crews are installing new wildlife crossings, which include standard culverts under the road. Construction crews are installing new wildlife crossings, which include standard culverts under the road including a box culvert. New wildlife fencing is being erected on both sides of the highway throughout the entire project zone, along with cattleguards installed at several accesses. Drivers are urged to slow down, exercise caution, and watch for heavy equipment and personnel near the roadway. No lane closures at this point. Watch for updates. Crews will be on site Mondays through Saturdays, 7:00 am to 7:00 pm. Estimated completion date is Friday, April 7, 2028.

  • Mar 2nd 2026 at 12:00 am to Nov 30th 2026 at 12:00 am
    US-191 from Emma Park Rd to Summit | PIN 21093

    Lane closures and pilot car operations for road widening and guardrail installation. Contact the project team: 435-264-3448 us191indiancanyon@utah.gov https://udotinput.utah.gov/us191indiancanyon

  • Mar 4th 2024 at 12:00 am to Dec 31st 2026 at 11:59 pm
    Park Lane, I-15, and Legacy Pkwy | PIN 15684

    UDOT is constructing a new interchange along I-15 at Shepard Lane in Farmington and improving pedestrian and bike connectivity along Park Lane. Construction is anticipated to end in 2026. Drivers should expect daytime work Monday through Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane and ramp closures.

  • Mar 4th 2024 at 12:00 am to Dec 31st 2026 at 11:59 pm
    NB I-15 Shepard Lane | PIN 15684

    Daytime work Monday-Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane closures to create a new I-15 interchange. Project contact: 385-758-2040 | shepardlaneinterchange@utah.gov | https://udotinput.utah.gov/shepardlaneinterchange

  • Nov 3rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    EB SR-9 Hurricane to Mount Carmel | PIN 21975

    Expect multiple work zones through SR-9 with both shoulder work and one-way traffic Monday through Thursday (daytime and nighttime work) in Zion National Park and shoulder work in Hurricane, Rockville, and Mount Carmel. Crews are installing fiber optic cables to improve broadband access.

  • Nov 3rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    WB SR-9 Hurricane to Mount Carmel | PIN 21975

    Expect multiple work zones through SR-9 with both shoulder work and one-way traffic Monday through Thursday (daytime and nighttime work) in Zion National Park and shoulder work in Hurricane, Rockville, and Mount Carmel. Crews are installing fiber optic cables to improve broadband access.

  • Nov 3rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    SB SR-20 & US-89 from I-15 to Mt. Carmel | 23435

    Expect multiple work zones through SR-89, and US-20 with shoulder work Monday through Thursday. Crews are installing fiber optic cables to improve broadband access.

  • Sep 2nd 2025 at 12:00 am to Dec 31st 2026 at 11:59 pm
    EB Pioneer Crossing I-15 to Redwood Rd | PIN 20561

    Lane closures for the construction of Flex Lanes and additional capacity. PI contact info: 385-510-2700 NWUtahCounty@utah.gov https://udotinput.utah.gov/PioneerCrossing

  • Sep 2nd 2025 at 12:00 am to Dec 31st 2026 at 11:59 pm
    WB Pioneer Crossing I-15 to Redwood Rd | PIN 20561

    Lane closures for the construction of Flex Lanes and additional capacity. PI contact info: 385-510-2700 NWUtahCounty@utah.gov https://udotinput.utah.gov/PioneerCrossing

  • Nov 3rd 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    NB SR-20 & US-89 from I-15 to Mt. Carmel | 23435

    Expect multiple work zones through SR-89, and US-20 with shoulder work Monday through Thursday. Crews are installing fiber optic cables to improve broadband access.

  • Nov 4th 2026 at 12:00 am to Nov 21st 2026 at 11:59 pm
    1600 N from 1200 W to State St | PIN 18428

    Flagging operations and intermittent road closures at intersections along 1600 North. See website for more details. Project Contact: 801-406-7707 1600north@utah.gov https://udotinput.utah.gov/1600north

  • Oct 5th 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    Big Cottonwood Canyon Culvert

    UDOT is repairing the culvert crossing on SR-190 at the Big Cottonwood Treatment Plant to ensure the culvert continues working effectively and efficiently for years to come.

  • Jul 13th 2026 at 12:00 am to Nov 30th 2026 at 11:59 pm
    700 East; 400 South to 1700 South

    UDOT is resurfacing the asphalt, replacing existing raised medians, and upgrading ADA pedestrian ramps. Hotline: 855-925-2801 #12095 Email: 700epaving@utah.gov

  • Mar 1st 2026 at 12:00 am to Oct 31st 2028 at 12:00 am
    2100 North in Lehi Utah

    The Utah Department of Transportation (UDOT) is building 2.8 miles of new freeway on 2100 North (SR-194) in Lehi to improve east-west travel times and overall connectivity for drivers across northwest Utah County.

  • Nov 6th 2026 at 9:22 pm to Nov 9th 2026 at 5:00 am
    Triumph Boulevard

    Road closure scheduled 11/06/2026 - 11/09/2026 due to Roadworks / License - Roadworks works (Utah DOT)

  • Mar 4th 2024 at 12:00 am to Dec 31st 2026 at 11:59 pm
    Frontage Road,United States Highway 89,Veterans Memorial Highway,Park Lane,United States Highway 89,Park Lane,United States Highway 89,Veterans Memorial Highway,United States Highway 89

    Daytime work Monday-Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane closures to create a new I-15 interchange.

  • Mar 4th 2024 at 12:00 am to Dec 31st 2026 at 11:59 pm
    United States Highway 89

    UDOT is constructing a new interchange along I-15 at Shepard Lane in Farmington and improving pedestrian and bike connectivity along Park Lane. Construction is anticipated to end in 2026. Drivers should expect daytime work Monday through Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane closures.

  • Mar 4th 2024 at 12:00 am to Dec 31st 2026 at 11:59 pm
    United States Highway 89

    UDOT is constructing a new interchange along I-15 at Shepard Lane in Farmington and improving pedestrian and bike connectivity along Park Lane. Construction is anticipated to end in 2026. Drivers should expect daytime work Monday through Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane closures.

  • Nov 9th 2026 at 12:00 am to Dec 21st 2026 at 11:59 pm

    Guardrail installation and shoulder work along Vernal Avenue. Hotline: 385-557-2585 Email: vernalavepaving@utah.gov

  • Mar 4th 2026 at 12:00 am to Dec 31st 2026 at 11:59 pm
    Frontage Road,Park Lane,Park Lane,Frontage Road,Park Lane,Park Lane,Park Lane,Park Lane,Park Lane,United States Highway 89,Park Lane,Veterans Memorial Highway,United States Highway 89,Veterans Memorial Highway,Park Lane,Park Lane,Park Lane,Park Lane,Park Lane,Park Lane

    UDOT is constructing a new interchange along I-15 at Shepard Lane in Farmington and improving pedestrian and bike connectivity along Park Lane. Construction is anticipated to end in 2026. Drivers should expect daytime work Monday through Friday from 7 a.m. to 5 p.m., weekend and night work as needed, and intermittent lane and ramp closures.

  • Oct 19th 2026 at 12:00 am to Feb 1st 2027 at 11:59 pm
    4700 West

    Flagging operations for drainage improvements along the west side of SR-134. To contact the Public Involvement team: Hotline: 385-557-2586 Email: sr134drainage@utah.gov

  • Nov 15th 2026 at 7:00 am to Nov 18th 2026 at 7:00 pm
    1600 North

    11/15 to 11/18 intermittent road closures with flagging at intersections along 1600 North between 1100 West and 650 West. Website: https://udotinput.utah.gov/1600North Email: 1600North@utah.gov Hotline: 801-406-7707

  • Nov 15th 2026 at 10:00 am to Nov 15th 2026 at 2:00 pm

    Moving, single lane closure for painting activities along SB I-215. To contact the public information team with questions or concerns: Hotline: 877-495-4240 Email: i215bridgepreservation@utah.gov

  • Nov 15th 2026 at 10:00 am to Nov 15th 2026 at 2:00 pm
    Belt Route

    Moving, single lane closure for painting activities along NB I-215. To contact the public information team with questions or concerns: Hotline: 877-495-4240 Email: i215bridgepreservation@utah.gov

  • Nov 15th 2026 at 10:00 am to Nov 15th 2026 at 2:00 pm
    4500 South

    Moving, single lane closures to accommodate painting activities on the 4500 South Bridge over I-215. To contact the public information team with questions or concerns: Hotline: 877-495-4240 Email: i215bridgepreservation@utah.gov

  • Nov 15th 2026 at 9:00 pm to Nov 19th 2026 at 6:00 am
    Legacy Parkway,West Glovers Lane

    Nightly lane closures and traffic shift for sign installation.